{"code":"CIV","codeName":"Civil Code","section":"1657.1","citation":"Civ. Code, § 1657.1","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 3. OBLIGATIONS [1427. - 3273.91.]","url":"https://blackletter.si/civil-code/division-3"},{"name":"PART 2. CONTRACTS [1549. - 1701.]","url":"https://blackletter.si/civil-code/division-3/part-2"},{"name":"TITLE 3. INTERPRETATION OF CONTRACTS [1635. - 1663.]","url":"https://blackletter.si/civil-code/division-3/part-2/title-3"}],"history":"Added by Stats. 2021, Ch. 222, Sec. 1.   (SB 762)   Effective January 1, 2022.","effective":"2022-01-01","html":"<p>Any time specified in a contract of adhesion for the performance of an act required to be performed shall be reasonable.</p>","text":"Any time specified in a contract of adhesion for the performance of an act required to be performed shall be reasonable.","otherVersions":[],"url":"https://blackletter.si/civil-code/interpretation-of-contracts-1657-1","source":"California Legislative Information bulk export (pubinfo)"}