{"code":"CIV","codeName":"Civil Code","section":"932","citation":"Civ. Code, § 932","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 2. PROPERTY [654. - 1422.]","url":"https://blackletter.si/civil-code/division-2"},{"name":"PART 2. REAL OR IMMOVABLE PROPERTY [[755.] - 945.5.]","url":"https://blackletter.si/civil-code/division-2/part-2"},{"name":"TITLE 7. REQUIREMENTS FOR ACTIONS FOR CONSTRUCTION DEFECTS [895. - 945.5.]","url":"https://blackletter.si/civil-code/division-2/part-2/title-7"},{"name":"CHAPTER 4. Prelitigation Procedure [910. - 938.]","url":"https://blackletter.si/civil-code/division-2/part-2/title-7/chapter-4"}],"history":"Added by Stats. 2002, Ch. 722, Sec. 3.   Effective January 1, 2003.","effective":"2003-01-01","html":"<p>Subsequently discovered claims of unmet standards shall be administered separately under this chapter, unless otherwise agreed to by the parties. However, in the case of a detached single family residence, in the same home, if the subsequently discovered claim is for a violation of the same standard as that which has already been initiated by the same claimant and the subject of a currently pending action, the claimant need not reinitiate the process as to the same standard. In the case of an attached project, if the subsequently discovered claim is for a violation of the same standard for a connected component system in the same building as has already been initiated by the same claimant, and the subject of a currently pending action, the claimant need not reinitiate this process as to that standard.</p>","text":"Subsequently discovered claims of unmet standards shall be administered separately under this chapter, unless otherwise agreed to by the parties. However, in the case of a detached single family residence, in the same home, if the subsequently discovered claim is for a violation of the same standard as that which has already been initiated by the same claimant and the subject of a currently pending action, the claimant need not reinitiate the process as to the same standard. In the case of an attached project, if the subsequently discovered claim is for a violation of the same standard for a connected component system in the same building as has already been initiated by the same claimant, and the subject of a currently pending action, the claimant need not reinitiate this process as to that standard.","otherVersions":[],"url":"https://blackletter.si/civil-code/prelitigation-procedure-932","source":"California Legislative Information bulk export (pubinfo)"}