{"code":"EDC","codeName":"Education Code","section":"17250.66","citation":"Ed. Code, § 17250.66","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"TITLE 1. GENERAL EDUCATION CODE PROVISIONS [1. - 32527.]","url":"https://blackletter.si/education-code/title-1"},{"name":"DIVISION 1. GENERAL EDUCATION CODE PROVISIONS [1. - 32527.]","url":"https://blackletter.si/education-code/title-1/division-1"},{"name":"PART 10.5. SCHOOL FACILITIES [17210. - 17672.]","url":"https://blackletter.si/education-code/title-1/division-1/part-10.5"},{"name":"CHAPTER 2.6. Alternative Design-Build Contracts [17250.60. - 17250.69.]","url":"https://blackletter.si/education-code/title-1/division-1/part-10.5/chapter-2.6"}],"history":"Added by Stats. 2022, Ch. 571, Sec. 14.   (AB 185)   Effective September 27, 2022.   Repealed as of January 1, 2029, pursuant to Section 17250.69.","effective":"2022-09-27","html":"<p>(a) If the school district elects to award a project pursuant to this chapter, retention proceeds withheld by the school district from the design-build entity shall not exceed 5 percent.</p><p>(b) In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the school district agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, before or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the school district and the design-build entity from any payment made by the design-build entity to the subcontractor.</p>","text":"(a) If the school district elects to award a project pursuant to this chapter, retention proceeds withheld by the school district from the design-build entity shall not exceed 5 percent. (b) In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the school district agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, before or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the school district and the design-build entity from any payment made by the design-build entity to the subcontractor.","otherVersions":[],"url":"https://blackletter.si/education-code/alternative-design-build-contracts-17250-66","source":"California Legislative Information bulk export (pubinfo)"}