{"code":"LAB","codeName":"Labor Code","section":"7260","citation":"Lab. Code, § 7260","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]","url":"https://blackletter.si/labor-code/division-5"},{"name":"PART 3. SAFETY ON BUILDINGS [7100. - 7384.]","url":"https://blackletter.si/labor-code/division-5/part-3"},{"name":"CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]","url":"https://blackletter.si/labor-code/division-5/part-3/chapter-1"},{"name":"ARTICLE 4. Structural Steel Framed Buildings [7250. - 7267.]","url":"https://blackletter.si/labor-code/division-5/part-3/chapter-1/article-4"}],"history":"Added by Stats. 1970, Ch. 1498.","effective":null,"html":"<p>Prior to removal of temporary floor plank, employees shall be instructed by assigned supervision the steps to be taken to perform the work safely and in proper sequence.</p>","text":"Prior to removal of temporary floor plank, employees shall be instructed by assigned supervision the steps to be taken to perform the work safely and in proper sequence.","otherVersions":[],"url":"https://blackletter.si/labor-code/structural-steel-framed-buildings-7260","source":"California Legislative Information bulk export (pubinfo)"}