{"code":"LAB","codeName":"Labor Code","section":"751.5","citation":"Lab. Code, § 751.5","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 2. EMPLOYMENT REGULATION AND SUPERVISION [200. - 2699.8.]","url":"https://blackletter.si/labor-code/division-2"},{"name":"PART 2. WORKING HOURS [500. - 890.]","url":"https://blackletter.si/labor-code/division-2/part-2"},{"name":"CHAPTER 3. Smelters and Underground Workings [750. - 752.5.]","url":"https://blackletter.si/labor-code/division-2/part-2/chapter-3"}],"history":"Amended by Stats. 1995, Ch. 903, Sec. 4.   Effective January 1, 1996.","effective":"1996-01-01","html":"<p>Where emergency repairs to, or maintenance or replacement of, machinery or equipment are necessary for the continuous operation thereof, the hours that an employee may be engaged in performing the emergency repairs, maintenance, or replacement, may, during the pendency of the emergency, exceed the period specified in Section <a href=\"/lab/750\">750</a>.</p>","text":"Where emergency repairs to, or maintenance or replacement of, machinery or equipment are necessary for the continuous operation thereof, the hours that an employee may be engaged in performing the emergency repairs, maintenance, or replacement, may, during the pendency of the emergency, exceed the period specified in Section 750.","otherVersions":[],"url":"https://blackletter.si/labor-code/smelters-and-underground-workings-751-5","source":"California Legislative Information bulk export (pubinfo)"}