{"code":"PCC","codeName":"Public Contract Code","section":"6972","citation":"Pub. Contract Code, § 6972","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]","url":"https://blackletter.si/public-contract-code/division-2"},{"name":"PART 1. ADMINISTRATIVE PROVISIONS [1100. - 9204.]","url":"https://blackletter.si/public-contract-code/division-2/part-1"},{"name":"CHAPTER 6.7. Construction Manager/General Contractor Method: Regional Projects on Expressways [6970. - 6974.]","url":"https://blackletter.si/public-contract-code/division-2/part-1/chapter-6.7"}],"history":"Amended by Stats. 2016, Ch. 753, Sec. 3.   (AB 2374)   Effective January 1, 2017.","effective":"2017-01-01","html":"<p>(a) A regional transportation agency may utilize the Construction Manager/General Contractor method of procurement to design and construct projects pursuant to this section.</p><p>(b) A regional transportation agency may enter into a Construction Manager/General Contractor contract pursuant to this chapter after evaluation of the traditional design-bid-build method of construction and of the Construction Manager/General Contractor method and the board of the regional transportation agency affirmatively adopts the procurement strategy in a public meeting.</p><p>(c) The entity responsible for the maintenance of the local streets and roads within the jurisdiction of the expressway shall be responsible for the maintenance of the expressway.</p>","text":"(a) A regional transportation agency may utilize the Construction Manager/General Contractor method of procurement to design and construct projects pursuant to this section. (b) A regional transportation agency may enter into a Construction Manager/General Contractor contract pursuant to this chapter after evaluation of the traditional design-bid-build method of construction and of the Construction Manager/General Contractor method and the board of the regional transportation agency affirmatively adopts the procurement strategy in a public meeting. (c) The entity responsible for the maintenance of the local streets and roads within the jurisdiction of the expressway shall be responsible for the maintenance of the expressway.","otherVersions":[],"url":"https://blackletter.si/public-contract-code/construction-manager-general-contractor-method-regional-6972","source":"California Legislative Information bulk export (pubinfo)"}