{"code":"PRC","codeName":"Public Resources Code","section":"25504","citation":"Pub. Resources Code, § 25504","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 15. ENERGY CONSERVATION AND DEVELOPMENT [25000. - 25997.7.]","url":"https://blackletter.si/public-resources-code/division-15"},{"name":"CHAPTER 6. Power Facility and Site Certification [25500. - 25543.]","url":"https://blackletter.si/public-resources-code/division-15/chapter-6"}],"history":"Amended by Stats. 1984, Ch. 1184, Sec. 8.5.","effective":null,"html":"<p>The notice of intention shall include a statement by the applicant describing the location of the proposed sites by section or sections, range and township, and county; a summary of the proposed design criteria of the facilities; the type or types of fuels to be used; the methods of construction and operation; the proposed location of facilities and structures on each site; a preliminary statement of the relative economic, technological, and environmental advantages and disadvantages of the alternative site and related facility proposals; a statement of need for the facility and information showing the compatibility of the proposals with the most recent electricity report issued pursuant to Section <a href=\"/prc/25308\">25308</a>; and any other information that an electric utility deems desirable to submit to the commission.</p>","text":"The notice of intention shall include a statement by the applicant describing the location of the proposed sites by section or sections, range and township, and county; a summary of the proposed design criteria of the facilities; the type or types of fuels to be used; the methods of construction and operation; the proposed location of facilities and structures on each site; a preliminary statement of the relative economic, technological, and environmental advantages and disadvantages of the alternative site and related facility proposals; a statement of need for the facility and information showing the compatibility of the proposals with the most recent electricity report issued pursuant to Section 25308; and any other information that an electric utility deems desirable to submit to the commission.","otherVersions":[],"url":"https://blackletter.si/public-resources-code/power-facility-and-site-certification-25504","source":"California Legislative Information bulk export (pubinfo)"}