{"code":"PRC","codeName":"Public Resources Code","section":"3907","citation":"Pub. Resources Code, § 3907","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 3.5. MINES AND MINING [3900. - 3985.]","url":"https://blackletter.si/public-resources-code/division-3.5"},{"name":"CHAPTER 1. Manner of Locating Mining Claims, Tunnel Rights, and Millsites [3900. - 3924.]","url":"https://blackletter.si/public-resources-code/division-3.5/chapter-1"}],"history":"Added by Stats. 1988, Ch. 259, Sec. 11.","effective":null,"html":"<p>The boundary lines of the tunnel shall be established by conspicuous and substantial monuments placed along the lines on the surface at an interval of not more than 600 feet from the face or point of commencement of the tunnel to the terminus of 3,000 feet therefrom.</p>","text":"The boundary lines of the tunnel shall be established by conspicuous and substantial monuments placed along the lines on the surface at an interval of not more than 600 feet from the face or point of commencement of the tunnel to the terminus of 3,000 feet therefrom.","otherVersions":[],"url":"https://blackletter.si/public-resources-code/manner-of-locating-mining-claims-tunnel-rights-and-millsites-3907","source":"California Legislative Information bulk export (pubinfo)"}