{"code":"PUC","codeName":"Public Utilities Code","section":"100151","citation":"Pub. Util. Code, § 100151","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 10. TRANSIT DISTRICTS [24501. - 107025.]","url":"https://blackletter.si/public-utilities-code/division-10"},{"name":"PART 12. SANTA CLARA VALLEY TRANSPORTATION AUTHORITY [100000. - 100619.]","url":"https://blackletter.si/public-utilities-code/division-10/part-12"},{"name":"CHAPTER 5. Powers and Functions of VTA [100110. - 100256.]","url":"https://blackletter.si/public-utilities-code/division-10/part-12/chapter-5"},{"name":"ARTICLE 4. Construction Manager/General Contractor Project Delivery Contracts [100150. - 100156.]","url":"https://blackletter.si/public-utilities-code/division-10/part-12/chapter-5/article-4"}],"history":"Added by Stats. 2013, Ch. 320, Sec. 1.   (AB 797)   Effective January 1, 2014.","effective":"2014-01-01","html":"<p>(a) Subject to the limitations of this article, the authority may utilize the CMGC project delivery method for public transit projects within its jurisdiction.</p><p>(b) The authority may enter into a CMGC project delivery method contract pursuant to this article if, after evaluation of the traditional design-bid-build process of construction and of the CMGC project delivery method in a public meeting, the authority makes a written finding that use of the CMGC project delivery method on the specific project under consideration will accomplish one or more of the following objectives: reduce project costs, expedite the project’s completion, or provide features not achievable through the design-bid-build method. This finding shall be made prior to the authority entering into a CMGC project delivery method contract. In the CMGC project delivery method proposal, the written findings shall be included as part of an application for state funds for a transit project.</p>","text":"(a) Subject to the limitations of this article, the authority may utilize the CMGC project delivery method for public transit projects within its jurisdiction. (b) The authority may enter into a CMGC project delivery method contract pursuant to this article if, after evaluation of the traditional design-bid-build process of construction and of the CMGC project delivery method in a public meeting, the authority makes a written finding that use of the CMGC project delivery method on the specific project under consideration will accomplish one or more of the following objectives: reduce project costs, expedite the project’s completion, or provide features not achievable through the design-bid-build method. This finding shall be made prior to the authority entering into a CMGC project delivery method contract. In the CMGC project delivery method proposal, the written findings shall be included as part of an application for state funds for a transit project.","otherVersions":[],"url":"https://blackletter.si/public-utilities-code/construction-manager-general-contractor-project-delivery-100151","source":"California Legislative Information bulk export (pubinfo)"}