{"code":"PUC","codeName":"Public Utilities Code","section":"103395","citation":"Pub. Util. Code, § 103395","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 10. TRANSIT DISTRICTS [24501. - 107025.]","url":"https://blackletter.si/public-utilities-code/division-10"},{"name":"PART 15. SAN MATEO COUNTY TRANSIT DISTRICT [103000. - 103700.]","url":"https://blackletter.si/public-utilities-code/division-10/part-15"},{"name":"CHAPTER 5. Powers and Functions of District [103200. - 103399.11.]","url":"https://blackletter.si/public-utilities-code/division-10/part-15/chapter-5"},{"name":"ARTICLE 12. Construction Manager/General Contractor Project Delivery Contracts [103394. - 103399.1.]","url":"https://blackletter.si/public-utilities-code/division-10/part-15/chapter-5/article-12"}],"history":"Added by Stats. 2013, Ch. 320, Sec. 2.   (AB 797)   Effective January 1, 2014.","effective":"2014-01-01","html":"<p>(a) Subject to the limitations of this article, the district may utilize the CMGC project delivery method for public transit projects within its jurisdiction.</p><p>(b) The district may enter into a CMGC project delivery method contract pursuant to this article if, after evaluation of the traditional design-bid-build process of construction and of the CMGC project delivery method in a public meeting, the district makes a written finding that use of the CMGC project delivery method on the specific project under consideration will accomplish one or more of the following objectives: reduce project costs, expedite the project’s completion, or provide features not achievable through the design-bid-build method. This finding shall be made prior to the district entering into a CMGC project delivery method contract. In the CMGC project delivery method proposal, the written findings shall be included as part of an application for state funds for a transit project.</p>","text":"(a) Subject to the limitations of this article, the district may utilize the CMGC project delivery method for public transit projects within its jurisdiction. (b) The district may enter into a CMGC project delivery method contract pursuant to this article if, after evaluation of the traditional design-bid-build process of construction and of the CMGC project delivery method in a public meeting, the district makes a written finding that use of the CMGC project delivery method on the specific project under consideration will accomplish one or more of the following objectives: reduce project costs, expedite the project’s completion, or provide features not achievable through the design-bid-build method. This finding shall be made prior to the district entering into a CMGC project delivery method contract. In the CMGC project delivery method proposal, the written findings shall be included as part of an application for state funds for a transit project.","otherVersions":[],"url":"https://blackletter.si/public-utilities-code/construction-manager-general-contractor-project-delivery-103395","source":"California Legislative Information bulk export (pubinfo)"}