{"code":"PUC","codeName":"Public Utilities Code","section":"185503","citation":"Pub. Util. Code, § 185503","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 19.5. CALIFORNIA HIGH-SPEED RAIL SERVICE [185000. - 185511.]","url":"https://blackletter.si/public-utilities-code/division-19.5"},{"name":"CHAPTER 5. Relocation of Utilities [185500. - 185511.]","url":"https://blackletter.si/public-utilities-code/division-19.5/chapter-5"}],"history":"Added by Stats. 2013, Ch. 35, Sec. 7.   (SB 85)   Effective June 27, 2013.","effective":"2013-06-27","html":"<p>If the authority requires the relocation within the right-of-way of any utility facility more than once within a period of 10 years, the authority shall pay the cost of the second relocation and any subsequent relocation within the 10-year period.</p>","text":"If the authority requires the relocation within the right-of-way of any utility facility more than once within a period of 10 years, the authority shall pay the cost of the second relocation and any subsequent relocation within the 10-year period.","otherVersions":[],"url":"https://blackletter.si/public-utilities-code/relocation-of-utilities-185503","source":"California Legislative Information bulk export (pubinfo)"}