{"code":"PUC","codeName":"Public Utilities Code","section":"7809","citation":"Pub. Util. Code, § 7809","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 4. LAWS RELATING TO UTILITY CORPORATIONS AND THEIR EMPLOYEES [7503. - 8290.2.]","url":"https://blackletter.si/public-utilities-code/division-4"},{"name":"CHAPTER 2. Street Railroads [7801. - 7818.]","url":"https://blackletter.si/public-utilities-code/division-4/chapter-2"}],"history":"Enacted by Stats. 1951, Ch. 764.","effective":null,"html":"<p>Any proposed railroad track may be permitted to cross any track already constructed, the crossing being made as provided in Chapter 1 of this division. In laying down the track and preparing therefor, not more than one block shall be obstructed at any one time, nor for a longer period than 10 working days.</p>","text":"Any proposed railroad track may be permitted to cross any track already constructed, the crossing being made as provided in Chapter 1 of this division. In laying down the track and preparing therefor, not more than one block shall be obstructed at any one time, nor for a longer period than 10 working days.","otherVersions":[],"url":"https://blackletter.si/public-utilities-code/street-railroads-7809","source":"California Legislative Information bulk export (pubinfo)"}