{"code":"SHC","codeName":"Streets and Highways Code","section":"333.1","citation":"Sts. & Hy. Code, § 333.1","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 1. STATE HIGHWAYS [50. - 897.]","url":"https://blackletter.si/streets-and-highways-code/division-1"},{"name":"CHAPTER 2. The State Highway System [230. - 635.]","url":"https://blackletter.si/streets-and-highways-code/division-1/chapter-2"},{"name":"ARTICLE 3. The State Highway Routes [300. - 635.]","url":"https://blackletter.si/streets-and-highways-code/division-1/chapter-2/article-3"}],"history":"Added by Stats. 1973, Ch. 644.","effective":null,"html":"<p>Notwithstanding Section <a href=\"/shc/253.3\">253.3</a>, no portion of the adopted Route 33 freeway between Foster Park and Cozy Dell Canyon Road shall be constructed as a freeway or expressway until a transportation corridor study, on a transportation corridor approximating such portion of the adopted Route 33 freeway, is undertaken and carried to a conclusion by the department in cooperation with the affected local governing agencies, including the County of Ventura and the City of Ojai, and a plan of action for fulfilling the corridor transportation needs has been mutually agreed upon by the parties conducting the study.</p><p>The transportation corridor study shall, when undertaken, follow a process which includes community involvement and participation in reaching a finding on the transportation needs, and in selection of the optimum means of fulfilling those needs, for the corridor and its related service area.</p>","text":"Notwithstanding Section 253.3, no portion of the adopted Route 33 freeway between Foster Park and Cozy Dell Canyon Road shall be constructed as a freeway or expressway until a transportation corridor study, on a transportation corridor approximating such portion of the adopted Route 33 freeway, is undertaken and carried to a conclusion by the department in cooperation with the affected local governing agencies, including the County of Ventura and the City of Ojai, and a plan of action for fulfilling the corridor transportation needs has been mutually agreed upon by the parties conducting the study. The transportation corridor study shall, when undertaken, follow a process which includes community involvement and participation in reaching a finding on the transportation needs, and in selection of the optimum means of fulfilling those needs, for the corridor and its related service area.","otherVersions":[],"url":"https://blackletter.si/streets-and-highways-code/the-state-highway-routes-333-1","source":"California Legislative Information bulk export (pubinfo)"}