{"code":"WAT","codeName":"Water Code","section":"1395","citation":"Wat. Code, § 1395","status":"in-force","lawOn":"2026-09-28","headings":[{"name":"DIVISION 2. WATER [1000. - 5951.]","url":"https://blackletter.si/water-code/division-2"},{"name":"PART 2. APPROPRIATION OF WATER [1200. - 1851.]","url":"https://blackletter.si/water-code/division-2/part-2"},{"name":"CHAPTER 6. Permits [1375. - 1410.2.]","url":"https://blackletter.si/water-code/division-2/part-2/chapter-6"},{"name":"ARTICLE 4. Application to Beneficial Use and Construction of Works [1395. - 1398.]","url":"https://blackletter.si/water-code/division-2/part-2/chapter-6/article-4"}],"history":"Enacted by Stats. 1943, Ch. 368.","effective":null,"html":"<p>Actual construction work upon any project shall begin within the time specified in the permit, which time shall not be less than 60 days from the date of the permit.</p>","text":"Actual construction work upon any project shall begin within the time specified in the permit, which time shall not be less than 60 days from the date of the permit.","otherVersions":[],"url":"https://blackletter.si/water-code/application-to-beneficial-use-and-construction-of-works-1395","source":"California Legislative Information bulk export (pubinfo)"}