CHAPTER 3. Backfilling Excavations With Native Spoil
Chapter 3 added by Stats. 1992, Ch. 1020, Sec. 1.4.
§§ 4200–4201 · 2 sections
- § 4200 As used in this chapter: (a) “Competent spoil” means soils that can be treated to bring their moisture content into the optimum range, and that can achieve the…
- § 4201 Any local agency that undertakes or contracts for an excavation for the installation, removal, maintenance, or repair of underground facilities may backfill…