BlackletterCalifornia law

Public Contract Code § 10211

ARTICLE 6.5. Department of Water Resources Design-Build Projects

In force on September 28, 2026Pub. Contract Code, § 10211Official source ↗

Added by Stats. 2021, Ch. 247, Sec. 4. (SB 626) Effective January 1, 2022. Repealed as of January 1, 2033, pursuant to Section 10214.

(a) If the department elects to award a project pursuant to this article, retention proceeds withheld by the department from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation of bids.

(b) In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the department and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, prior to or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the department and the design-build entity from any payment made by the design-build entity to the subcontractor.