Public Contract Code § 10254
ARTICLE 8. Modifications; Performance; Payment
If the defaults are not remedied within the time specified in the notice, the contractor’s control shall terminate as of the expiration of that time.
ARTICLE 8. Modifications; Performance; Payment
If the defaults are not remedied within the time specified in the notice, the contractor’s control shall terminate as of the expiration of that time.