ARTICLE 121.1. Metropolitan Water District of Southern California-Alternative Project Delivery Program [21568. - 21568.11.]
Article 121.1 added by Stats. 2022, Ch. 275, Sec. 2.
§§ 21568–21568.11 · 12 sections
- § 21568 (a) The Legislature finds and declares that severe drought conditions and climate change have negatively impacted the imported water supplies of the…
- § 21568.1 (a) Upon approval by its governing body, the Metropolitan Water District of Southern California may use, in addition to other methods of project delivery…
- § 21568.2 As used in this article: (a) “Best value” means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle…
- § 21568.3 (a) The district shall follow the design-build procedure described in Chapter 4 (commencing with Section 22160) to award a design-build contract pursuant to…
- § 21568.4 The procurement process for progressive design-build projects shall proceed as follows: (a) The district shall prepare and issue a request for qualifications…
- § 21568.5 The procurement process for Construction Manager/General Contractor method projects shall proceed as follows: (a) (1) The district shall establish a procedure…
- § 21568.6 (a) A design-build entity, construction manager, or construction contractor shall not be awarded a construction contract unless it provides an enforceable…
- § 21568.7 (a) The district may not award a design-build-operate contract for any project pursuant to this article. A contract may, however, cover operations during a…
- § 21568.8 Any design-build entity or Construction Manager/General Contractor that is selected to construct a project pursuant to this article shall possess or obtain…
- § 21568.9 If the district elects to award a project pursuant to this article, retention proceeds withheld by the district from the design-build entity or Construction…
- § 21568.10 Nothing in this article affects, expands, alters, or limits any rights or remedies otherwise available at law.
- § 21568.11 (a) The provisions of this article pertaining to the progressive design-build and Construction Manager/General Contractor delivery methods shall remain in…