ARTICLE 5. Friant Dam
Article 5 added by Stats. 1943, Ch. 370.
§§ 11225–11227 · 3 sections
- § 11225 The unit designated as Friant Dam consists of a dam, reservoir, and one or more hydroelectric power plants to be located on the San Joaquin River at or near…
- § 11226 Friant Dam shall be constructed and used primarily for improvement of navigation, flood control, and storage and stabilization of the water supply of the San…
- § 11227 The dam shall be built to such height and the power plant or plants shall be of such capacity as the department determines. The reservoir shall have such…